main service disconnect panel, secondary electrical boxes, and rigid conduit on the outer building wall over weather-resistive house wrap (DuPont Tyvek DrainWrap). The installation is positioned on the exterior wall adjacent to a framed vinyl window opening, with all metallic enclosures and conduit runs painted in a uniform, color-matched finish prior to final siding installation.